INSTALLATION


E-mail: sales@eg-tent.com
Tel: +86- 510- 85162053/ 85110979/ 85161511
Fax: +86- 510- 85123989

INSTALLATION >INSTALLATION

  • ● Step One

    Prepare all the parts of the frame,connecting part, stands, beam. See the picture on the left.

  • ● Step One

    Install the Base, connect with column.

  • ● Step One

    Install the Al. Main Frame

  • ● Step Two

    Connect all the connecting part of the frame, conner, roof diagonal stay. See the picture on the lift.

  • ● Step Two

    Install the Main Profile

  • ● Step Two

    Install the Top Covering and Side Wall

  • ● Step Three

    Fix the all parts of the main frame

  • ● Step Three

    Install the Gable Cloth

  • ● Step Three

    Fix the top parts, then install the roof cloth. See the picture on the lift.

  • ● Step Four

    Tensioning the top roof, Connect the wall standard. See the picture on the lift.

  • ● Step Four

    Install the top covering

  • ● Step Five

    Install the Side wall roof and lining and finished. See the picture on the lift.

  • ● Step Five

    Fix the top covering with frame

  • ● Step Six

    Install and fix the Gable Cloth

  • ● Step Seven

    Install and fix the side wall